A product name or tank diameter is rarely enough to compare two quotations. The model, connections, pressure conditions and document scope all affect whether equipment will fit the system. A short, structured request makes those differences easier to review.
Describe the Process Duty
- Feedwater, stored liquid or treatment media
- Normal and maximum pressure, temperature and operating cycles
- Required flow, capacity, membrane format or number of elements
- Cleaning chemicals, salinity or other relevant water chemistry
Attach the Interface Information
Include the existing model number or drawing where the order replaces installed equipment. For tanks, show openings, valves, central pipe and base support. For membrane housings, show element count, port direction, connection standard and support positions. For pipes and filters, state the joint, nominal diameter and available service space.
Make the Approval Scope Clear
List any project standards, certificates, inspection records, test reports, packaging requirements and destination-market documents needed for approval. Certification references can be product-specific, so identify which item and market the document must cover.
Include the Commercial Details
| Item | What to State |
|---|---|
| Quantity | Order quantity, spare units and any staged delivery |
| Delivery | Destination, required date and packaging expectations |
| Customization | Drawing revision, material, color, opening or private-label requirement |
| Documents | Datasheet, drawing, test report and certificate scope required |
For a new vessel, begin with the FRP tank range. For an RO project, compare membrane housing formats and send the skid drawing with the operating data.